Skip to content
Menu
Atlas Homes TX.  Custom Homebuilder / Major Remodeling
  • ATLAS HOMES TX
  • About
  • Remodeling
  • Residential
  • Commercial
  • Gallery
    • Backyard Oasis
    • Custom Cabinets & Woodworking
    • Custom Fountains
    • Custom Garage
    • Custom Remodeling
    • Custom Room Additions
    • Exterior Painting
    • Framing
    • Garage Additions
    • Outdoor Patio
    • Siding
  • Blog
  • Contact
Atlas Homes TX.  Custom Homebuilder / Major Remodeling
interior finishing

How to install hardwood floors

Posted on January 20, 2025

Installing hardwood flooring is very much like putting a puzzle together. There are three main installation methods. These are nail-down installation, glue-down installation, and floating installation. It is assumed that you have a level subfloor that is wood for nail-down installation. Glue-down and floating installations can usually be done on both wood and concrete subfloors, but it must be level also.

Thank you for reading this post, don't forget to leave a comment. 

Nail-down installation

1. Remove any baseboards or shoe moldings. Baseboard is used to hide the gap that you must leave for expansion and contraction of wood. So, you will want to make sure your subfloor is clear to the walls in order to have a place to come back and install the base and shoe molding later. The standard gap between the flooring and the walls is 3/16″ to 3/4″ depending on your manufacturer and style of flooring.

2. Screw down any loose or squeaky boards and undercut any door jambs to allow for the wood to be installed underneath. A helpful tip is to use the backside of one of your boards to determine the height needed to be cut off of your door jambs.

3. Start laying out the first row. Try to run the boards perpendicular to your floor joists if possible. You will need to either pop a chalk line or stretch a line parallel to your first wall. Make sure and account at this point for any out of square issues in your room. Once you start running boards they will appear as straight as the first board. You usually would measure from one side of the wall to the other and adjust any discrepancies with this first row. Make sure and predrill your first row or two for nails and face nail them into joists if possible.

4. Dry fit the next 3 feet or so. Make sure you are pulling your strips or planks from three separate boxes randomly so that the natural graining of the wood will vary slightly. This way your installed floor will have a more uniform look. Now you can layout all your boards for 3 feet or so and make your length cuts accordingly.

5. Nail down the next rows. Use a flooring nailer to nail through the tongue of the board. These are usually available for rent at most tool rental outlets. Using a rubber mallet to shoot the nail through the tongue. Make sure you adjust the nailer so that it countersinks the boards. Keep alternating nailing and dry-fitting boards to assure a proper fit.

6. Nail around any obstacles in the floor such as cabinets or pipes/fixtures that come out of the subfloor. Make sure you leave the appropriate gap around any of these obstacles.

7. Face nail the last few rows when you come to the edge of the room.

8. Next install your transitions and base moldings. Make sure you allow for a gap inside your transition. Also, make sure that you do not nail down the transition or moldings to the wood floor. You will need to nail the base moldings into the wall and the transitions into the floor in a place where it will not come into contact with the wood. Sometimes it is helpful to add some construction adhesive to the bottom of the transitions as these are usually high traffic areas. Over time this will prevent squeaking.

Glue-down installation

1. Remove any baseboards or shoe moldings. Baseboard is used to hide the gap that you must leave for expansion and contraction of wood. So, you will want to make sure your subfloor is clear to the walls in order to have a place to come back and install the base and shoe molding later. The standard gap between the flooring and the walls is 3/16″ to 3/4″ depending on your manufacturer and style of flooring.

2. If installing over a wood subfloor, screw down any loose or squeaky boards, Undercut any door jambs to allow for the wood to be installed underneath. A helpful tip is to use the backside of one of your boards to determine the height needed to be cut off of your door jambs.

3. Start laying out the first row. Try to run the boards perpendicular to your floor joists if possible. You will need to either pop a chalk line or stretch a line parallel to your first wall. Make sure and account at this point for any out of square issues in your room. Once you start running boards they will appear as straight as the first board. You usually would measure from one side of the wall to the other and adjust any discrepancies with this first row. Glue down this first row.

4. Dry fit the next 3 feet or so. Make sure you are pulling your strips or planks from three separate boxes randomly so that the natural graining of the wood will vary slightly. This way your installed floor will have a more uniform look. Now you can layout all your boards for 3 feet or so and make your length cuts accordingly.

5. Apply glue a foot or so out from the board and glue down the next few rows. Keep in mind the larger the room the less area away from your board you will be able to glue at a time. Make sure and keep some cleanup rags to try and keep the glue off the wood. Most manufacturers sell these as accessories. You can also use Acetone on a cotton or cheesecloth rag.

6. Glue around any obstacles in the floor such as cabinets or pipes/fixtures that come out of the subfloor. Make sure you leave the appropriate gap around any of these obstacles.

7. Glue down the last few rows when you come to the edge of the room.

8. Next install your transitions and base moldings. Make sure you allow for a gap inside your transition. Also, make sure that you do not glue down the transition or moldings to the wood floor. You will need to nail the base moldings into the wall and glue the transitions into the floor in a place where it will not come into contact with the wood using some construction adhesive to the bottom of the transitions.

  • Atlas Homes custom homebuilder
  • austin
  • bathroom remodeling kitchen remodeling
  • Blog ATLAS HOMES TX CUSTOM HOMEBUILDER AND MAJOR REMODELING CONTRACTOR
  • Houston 713 545 2429
  • SAN ANTONIO 713 545 2429 TEXAS

From the Blog

  • 203K loan Benefits to Sellers,
  • How to install hardwood floors
  • 10 Important Things to Consider Before Designing a New Kitchen from Atlas Homes TX
  • Hanging Curtains? Don’t Forget the Rods and Finials!
  • ATLAS GREEN HOMES 203k contractor Houston . Austin . San Antonio .
  • The Top Contractor Scams and How to Avoid Them -Tips from ATLAS GREEN HOMES
  • Enhance your Flooring with us
  • Tips for choosing a contractors to build your room addition
  • Bathroom Enhancements by Atlas Homes
  • HOW TO GET FLOOR PLANS OF A HOUSE- ARE HOUSE FLOOR PLANS PUBLIC RECORD?

Why Work With Atlas Homes?

* Over 40 years of experience
* Complete references available
* Guaranteed price - no surprises
* All work is fully warrantied
* Always on time and on budget
* Professional work
* High quality, name brand products
* Financing available.
* We have completed many 203k government FHA & VA loan program.

    Please tell us about your projects and looking forward to working with you.

    Atlas Green Homes

    Your Name (required)

    Your Email (required)

    Your telephone number

    What kind of Projects you have in mind?

    Do you need financing (required)

    Please tell us about your project & How soon would you like to start?

    Security image: captcha

    Verify security image:

    ©2025 Atlas Homes TX. Custom Homebuilder / Major Remodeling

    Atlas Green Homes. Subsidiary of Atlas Homes of Texas All Rights Reserved.

    | WordPress Theme: EcoCoded